Air Conditioning, Heat Pump and Environmental Control System Case Studies from a small selection of our completed projects

The Tower St Georges Wharf London

The Tower, St Georges Wharf, London

Prestigious river front residential development in London. 50 storey building containing over 200 residential apartments.

Mitsubishi VRF, 800 fan coils, 230 heat pump boilers, controls package, local apartment BMS.

All apartments include discrete bulkhead mounted fan coils and heat pump boilers.

Main contractor St George PLC

Contract sum in excess of £2.5M

Strata SE1, Elephant and Castle, London

Prestigious residential development in London.

42 storey building containing over 150 residential apartments.

Mitsubishi VRF, 125 fan coils, energy monitoring and controls.

Upper floors include discrete bulkhead mounted fan coils and controls.

Main contractor Multiplex Construction (UK) Ltd

Contract sum in excess of £0.5M

Atmosphere Aircon Installation at Strata SE1 London
Atmosphere Aircon Installation at Athletes Village London

Plot 7 , Athletes Village, London

Athlete’s accommodation for the 2012 Olympic Games

Toshiba VRF Air conditioning, 70 off fan coils, energy monitoring and controls.

Discrete bulkhead mounted fan coils for all apartments.

Main contractor Bovis Lend Lease

Contract sum in excess of £0.35M

Paddington Central , London.

Prestigious residential development in London.

Daikin VRV, 700 fan coils energy monitoring and controls.

All apartments include discrete bulkhead mounted fan coils.

Main contractor Coteba Ltd

Contract sum in excess of £1.0M

Atmosphere Aircon Installation at Paddington Central London
Atmosphere Aircon Installation at Cashmere Wharf, London Dock

Cashmere Wharf at London Dock.

26 floors with 133 apartments. This development required more than just technical solutions to meet the brief within budget, specific service levels were also required to meet the demands of this

Project Description:

A number of specific requirements were needed to be achieved on the site by Atmosphere, driven by the nature of the project and the requirements of the client. One of these was to reduce the noise levels of the HVAC system. The project also demanded that deliveries needed to be timed and without packaging to reduce waste management services on this site.

Contract sum in excess of £1.5M

Vine Street.

Client – Urbanest.

Shell and core fit out works to a student accommodation, office and public space development.

A development of 640 student bedrooms and studios across 3 buildings. The project also features a 11 storey office building, Roman wall exhibition space and a basement over 2 levels.

VRF air conditioning equipment provide throughout the office and public areas.

Contract sum in excess of £0.60M

Atmosphere Aircon Installation at Vine St, London
Air conditioning for residential, commercial and retail developments

Chelsea Creek Block F

Main contractor – St George PLC

VRV air conditioning installtion to the residential apartments to block F of this new build development. This 8 storey block is comprised of 147 apartments ranging from DMS, standard, premier and penthouse. It also has a commercial unit at ground level and a basement car park

Contract sum in excess of £1.5M

Vine Street.

Client – Urbanest.

Shell and core fit out works to a student accommodation, office and public space development.

A development of 640 student bedrooms and studios across 3 buildings. The project also features a 11 storey office building, Roman wall exhibition space and a basement over 2 levels.

VRF air conditioning equipment provide throughout the office and public areas.

Contract sum in excess of £0.60M

Atmosphere Aircon Installation at Vine St, London
Air conditioning for residential, commercial and retail developments Battersea, London by Atmosphere Aircon

Battersea Reach

Main contractor -: St George PLC

We were contracted for the complete mechanical installation of the VRV air conditioning equipment across several separate buildings of their Battersea redevelopment. These blocks included H&J, K&L, M&N, P and T totalling 573 residential units.

Contract sum in excess of £1.5M

One Blackfriars, London

We were contracted for the mechanical and controls installation of water cooled VRF air conditioning equipment across the complete redevelopment.

The developement consists of 275 residential apartments over 42 floors and served by 1000 fan coil units and asscoaited water cooled condensers.

Contract sum in excess of £2.8M

Atmosphere Aircon Specialist Installation at One Blackfriars London
Atmosphere Aircon Specialist Installation at Brunel University, Uxbridge, London.

Brunel University, Uxbridge, London.

A suite of three environmental test chambers to meet EN23953 testing standards.

  • Temperature and humidity control
  • Precision air flow and distribution.

D&B project – Supplied and installed cold room suite, insulated floors, AHU’s, ductwork, chilled water and hydronic circuits, bespoke control system, refrigerant leak detection, humidification circuits and full electrical installation.

Main contractor Quoin Construction Ltd.

Refrigeration component manufacturer

A suite of four environmental test chambers for ERP, efficiency and stress testing of refrigeration equipment.

Wide variable temperature control.

D&B project – Supplied and installed cold room suite, insulated floors, AHU’s, ductwork, chilled water and hydronic circuits, bespoke control system, refrigerant leak detection, energy monitoring and full electrical installation.

Direct contract with end user.

Atmosphere Airconditioning
Atmosphere Airconditioning
Atmosphere Airconditioning accreditations

For reliable, fuss-free climate control for your space, give us a call today 0800 783 2746

Atmosphere are experts with treating the air within your environment, London, Buckinghamshire, Northamptonshire, Cambridgeshire, Bedfordshire, Peterborough.

Whether you wish to improve your comfort, energy efficiency, your processes or protect your equipment, we can engineer a solution – we call this Airgineering!